top of page


Essential Elements of a Procurement Management Plan
A procurement management plan provides the structure needed to control how goods and services are sourced, evaluated, contracted, and delivered. This article explains the key components of an effective procurement plan, including strategy, roles, documentation, vendor selection, scheduling, contract management, and procurement risk.
Sep 273 min read


The Silence Before the Overrun Recognizing Trouble Before KPI's Turn Red
Major project overruns rarely arrive like a lightning strike. They usually begin as a quiet change in the atmosphere.
Jun 2815 min read


From PMO to Project Intelligence Office Leading Capital Projects With Better Decisions
Large capital projects rarely fail because boards lacked reports. They fail because leaders did not see risk early enough, did not believe the signals they saw, or did not have a reliable way to compare today’s project with the hundreds of projects that came before it.
Jun 2113 min read


Carbon Baseline Drift in Major Projects and Why It Matters
A major project rarely finishes as the project that was first modelled. The plot plan changes.
Jun 1718 min read


Embodied Carbon Is Now a Project Cost Curve
Embodied carbon is moving out of the sustainability annex and into the project controls room. For capital-intensive projects, the carbon locked into steel, concrete, equipment, fabrication, transport, installation, and construction methods is becoming a commercial variable.
Jun 312 min read


Who Owns Carbon on EPC Projects?
Carbon on an EPC project does not sit neatly in one department, one contract, or one emissions scope. It moves through design decisions, purchase orders, temporary power plans, fabrication yards, chartered vessels, commissioning fuel, and supplier data systems.
Apr 1515 min read


Project Approval Vs Readiness: Why Sanction Doesn't Mean Start
A project can be fully approved and still not be ready to execute. That is not a contradiction.
Feb 2216 min read


Logistics Is a Design Constraint, Not a Support Function
A project can be perfectly engineered on paper and still be impossible to build at site. That is not a logistics problem at the end.
Feb 1515 min read


Carbon Is Becoming a Design Constraint, Not Just a Reporting Metric
Carbon used to arrive late in the project conversation. The design was largely fixed, procurement was under way, and the sustainability team was asked to calculate the footprint, prepare a disclosure, or support an external commitment.
Nov 26, 202513 min read
bottom of page
